Removing a 25,000 lb piece of machinery from a medical clinic or hospital, what could go wrong? It can be crucial to other surrounding equipment and to your facility to have safe and efficient removal services performed so that your facility will have peace of mind knowing that this process will be handled correctly. A few tips below will help this removal process go more smoothly and will get you to the goal of out with the out and in with the new more quickly.

Removal Path

To start, cleaning of any removable clutter is always overlooked and can become an obstacle that can be avoided. Measuring will be the next step to take when its time to start moving any type of equipment. A tape measurer will be your best friend since when it comes to moving high or low energy linacs, each have a minimum requirement for the number of inches required for room clearance.  Accurately measuring all building doors including the vault and outside door along the removal path is very important. Prior to the arrival or replacement equipment, a professional vendor will request a rig info sheet to be submitted to guarantee that there is no door frames or walls that will need to be removed. If the vendor does not ask about the measurements beforehand, this is a red flag that you should be looking for equipment elsewhere.

Safety Concerns

When transporting heavy equipment at any times, the safety of the removal team is of utmost importance. If the above-mentioned measurements are done inaccurately and realize that a vault door must be removed with late notice, this will pose a very big safety hazard. Depending on size, vault doors can easily weigh a few thousand pounds and unfortunate deaths have resulted when removal of these doors have been done incorrectly. When they doors need to be removed, it is critical that they are removed by professionals that have experience in the field.  Last minute decisions for vault door removal will also cut into extra expenses that was not part of the company budget so it again if very important for the measurements to be calculated right the first time. Proper liability insurance should be provided by your vendor when on site during the removal process as well.

Loading Space

Once you have the old equipment outside the next step is often overlooked as well. The loading area needs to have enough space in order to load the linear accelerator into trailer for transportation. Facilities will typically need to block off any side streets or parking spots to allow a safe loading area. If loading space is unavailable, the removal team will need to utilize a forklift of suitable size to lift and move machinery to the trailer manually.

Facility Jobs

No matter the size or details of removal that is performed, there will be responsibilities of the facility that will be requested. Generally, the removal team will ask local facility engineers, electricians, or plumbers to turn off the water or other power sources that are attached to the specific equipment that is being removed. This will protect the office building from having potentially dangerous live power to the area and helps to not disrupt any of the surrounding rooms that lighting and power may be connected to as well. Many times, the facility will manage and schedule the removal times so that it is occurring after hours or assist in security throughout the building.

As an independent LINAC service company, Acceletronics is dedicated to delivering the best equipment performance and services for linear accelerators and CT scanners across all major brands and models, as well as new and refurbished LINAC systems for sale.  More information can be found online at https://www.acceletronics.com/.

Leave a Reply